Description
5200 HP HARBOR TUGBOAT
HARBOR TUGBOAT [13112026.VED006.1809]
FLAG: KOREA
CLASS: KOMSA, COASTAL TRADING
BUILT: 2011, KOREA
LOA/LBP/B/D: 38.00 / 32.50 / 10.00 / 4.50 M
GRT: 286 T
DRAFT: 3.45 M
M/E: YANMAR 2,610 PS X 750 RPM X 2 SETS (TOTAL 5,200 HP)
A/E: STX-CUMMINS 168 KW X 1,800 RPM X 2 SETS
SPEED: TRIAL MAX 14.55 KNOTS
BOLLARD PULL: AHEAD 63.12 T
ANCHOR WINCH: HYD’ 60 T, 12 M/MIN
TOWING HOOK: SPRING TYPE, SAFETY WORKING LOAD 60 TONS
WINDLASS: TOWING WINCH 2.5/5 TON X 80/40 MIN/MIN
PROPULSION: ROLLS ROYCE US 205 AQUA MASTER AZT US-205FP, 266 RPM X 2 SET
FIRE PUMP: 240 CBM/H X 140 M X 1 SET
CREW COMPLEMENT: 6 P
LAST/NEXT SS SURVEY: AUG., 2, 2026 / AUG., 1, 2031
LOCATION: TRADING IN KOREA
-------------------------------------------------------------------------------------
5200 BHP HARBOR TUGBOAT
HARBOR TUGBOAT
FLAG: KOREA
CLASS: KR, COASTAL TRADING
BUILT: DEC., 2026, KOREA
LOA/LBP/B/D: 38.20 / 32.20 / 10.30 / 4.50 M
GRT: 479 T
DRAFT: 3.50 M
M/E: YANMAR 6EY26W, 2,261 PS X 750 RPM X 2 SETS (TOTAL 5,200 PS)
SPEED: 13 KNOTS
BOLLARD PULL: ABT 60.0 T
PROPULSION: KONGSBERG US 205S P20FP
TOWING HOOK: SWL 70 T
TANK CAPACITY: FO 81, DO 41, FW 27, FOAM 3 CBM
CREW COMPLEMENT: 6 P
** SHE IS NOW UNDER CONSTRUCTION AND CAN BE DELIVERED AROUND JAN., 2027
LOCATION: KOREA
-------------------------------------------------------------------------------------
O-MUTTRAH [12112026.VED167.2238]
BP: 71 T BP
DWT 318 MTS ON 5.35M DRFT
BLT 12/2014 AT HIN LEE (ZHUHAI) SHIPYARD CO LTD - ZHUHAI GD, CHINA
CLASS LR
GRT 493, NRT 147
LOA 32M, BEAM 13M, DEPTH 5.4M
M/E CATERPILLAR 3516C-HD X 2 SETS, BHP 5438 TOTAL
ANNUAL SURVEY: 25 SEP 26 – 23 MAR 27
BOTTOM SURVEY: 29 SEPT 27
HULL INTERMEDIATE: 25 SEPT 26 – 23 MAR 28
SPECIAL SURVEY: 24 SEP 29 – 23 DEC 29
-------------------------------------
O-SEEB
BP: 71 T BP
DWT 318 MTS ON 5.5M DRFT
BLT 11/2014 AT HIN LEE (ZHUHAI) SHIPYARD CO LTD - ZHUHAI GD, CHINA
CLASS LR
GRT 493, NRT 147
LOA 32M, BEAM 13M, DEPTH 5.4M
M/E CATERPILLAR 3516C-HD X 2 SETS, BHP 5220 TOTAL
ANNUAL SURVEY: 25 SEP 26 – 23 MAR 27
BOTTOM SURVEY: 29 SEPT 27
HULL INTERMEDIATE: 25 SEPT 26 – 23 MAR 28
SPECIAL SURVEY: 24 SEP 29 – 23 DEC 29
WOG / SUBJECT TO AVAILABILITY
FURTHER DETAILS TO NAMED INTEREST ONLY


