Description
2010 BUILT 30M 3200 BHP TUG BOAT SALE
SHE HAS LOW RUNNING HOURS AND RECENTLY COMPLETED HER DD.
CURRENTLY OPERATING IN EAST MALAYSIA. (160092026.VED077.0944)
BRIEF DETAILS | |||
BUILT | : |
| 2010 / MALAYSIA |
CLASS | : |
| NK |
LOA | : |
| 29.92 M |
MOULDED BREADTH | : |
| 9.76 M |
MOULDED DEPTH | : |
| 4.70 M |
DRAFT | : |
| 3.352 M |
GRT/NRT | : |
| 338/102 |
DEADWEIGHT | : |
| 218 |
SPEED | : |
| 11 KNOTS |
BOLLARD PULL | : |
| 40 TONNES |
COMPLEMENT | : |
| 10 MEN |
|
|
|
|
MACHINERY | |||
MAIN ENGINE | : |
| 2 X CUMMINS KTA50-M2, 1600HP @ 18000RPM |
GENERATOR | : |
| 2 X CUMMINS 6BT5-9-D(M) 78KW @ 1500RPM |
GEARBOX | : |
| 2 X REINTJES WAF 665, RATIO OF 5.95: 1 |
|
|
|
|
TANK CAPACITY | |||
FUEL OIL | : |
| 216 M³ |
FRESH WATER | : |
| 32 M³ |
BALLAST TANK (FRESH WATER) | : |
| 70 M³ |
|
|
|
|
PROPULSION |
|
|
|
PROPELLER | : |
| 2 X 4-BLADED MANGANESE BRONZE PROPELLER, 2350MM IN DIAMETER |
SHAFT | : |
| 2 X SEA WATER LUBRICATION SHAFT |
TUNNEL THRUSTER | : |
| 1 X HYDRAULIC THRUSTMASTER THRUSTER 36TT250L |
|
|
|
|
DECK EQUIPMENT | |||
WINDLASS | : |
| 1 X 3 TON HYDRAULIC ANCHOR WINDLASS |
ANCHOR | : |
| 2 X 660KG EACH |
TOWING HOOK | : |
| 1 X 40 TON |
TOWING WINCH | : |
| 1 X 30 TONNE HYDRAULIC WINCH |
FIFI SYSTEM | : |
| 2 X FIRE MONITOR X 600M3 PER HOUR AT 140M |
--------------------------------------------------------------------------------------------------------------
2012 BUILT 40M 3700 BHP AHT
NOTE THAT TUG HAS TIER 1 ENGINES INSTALLED, THUS BUYERS HAVE TO CONFIRM ACCEPTABILITY.
TUG WAS COMPLETED IN 2012, BUT BUYERS DID NOT TAKE DELIVERY OF THE TUG. LAUNCHING DATE WILL BE IN 2026.
SHE CAN BE INSPECTED IN EAST MALAYSIA AND DELIVERED 4 MONTHS UPON CONFIRMATION.
BRIEF SPECIFICATION (14092026.VED077.0944) | ||
BUILT | : | 2012 / MALAYSIA |
CLASS | : | BV |
L.O.A. | : | 40.0 M |
BREADTH MLD | : | 11.8 M |
DEPTH MLD | : | 4.6 M |
DESIGNED DRAFT | : | 3.8 M |
DEADWEIGHT | : | 345 TONNES |
BOLLARD PULL | : | 45 TONNES |
TRIAL SPEED | : | 11 KNOTS |
ACCOMMODATION | : | 20 MEN |
|
|
|
TANK & DECK CAPACITY | ||
FUEL OIL | : | 300.00 M³ |
FRESH WATER | : | 80.00 M³ |
DECK LOADING | : | 5 TONNES/M³ |
CLEAR DECK AREA | : | APPROX. 150 M³ |
|
|
|
PROPULSION SYSTEMS |
|
|
MAIN ENGINE | : | 2 X MITSUBISHI S16R-MPTK MARINE DIESEL ENGINE RATED 1,850BHP @ 1,650RPM |
GENERATOR | : | 3 X CAT C6.6 MARINE DIESEL ENGINE C/W ALTERNATOR 143KW, 415V, 3PH, 1500 RPM |
PROPELLER & KORT NOZZLE | : | 2 X SOLID 4 BLADES MANGANESE BRONZE PROPELLER |
|
|
|
DECK MACHINERY & EQUIPMENT | ||
ANCHOR WINDLASS | : | 30MM ELECTROHYDRAULIC ANCHOR WINDLASS C/W DOUBLE GYPSY |
ANCHOR | : | 2 X 900-KGS STOCKLESS BOWER ANCHOR |
TOWING WINCH | : | 1 X 60-TONS DRUM PULL @ 6M/MIN |
TUGGER WINCH | : | 2 X 5-TONS X 10M/MIN SINGLE DRUM HYDRAULIC TUGGER WINCH |
SHARK JAW | : | 1 X 200-TONS SCHEMATIC HYDRAULICALLY OPERATED ANCHOR HANDLING FORK |
TOWING PIN | : | 1 X 200-TONS SCHEMATIC HYDRAULICALLY TOWING PIN |
CAPSTAN | : | 2 X 5-TON X 12M/MIN HYDRAULIC VERTICAL CAPSTAN C/W LOCAL CONTROL |
STERN ROLLER | : | 1 X 150-TON SWL MILD STEEL STERN ROLLER |
BOW THRUSTER SYSTEM | : | 1 X 5.0 TONNES SCHOTTEL BOW THRUSTER FPP |
|
|
|
RADIO & NAVIGATION EQUIPMENT | ||
GMDSS 2-WAY VHF TRANSCEIVERS | : | 2 X MCMURDO R2 |
RADAR | : | 1 X FURUNO FAR-2117 MK3 |
GPS NAVIGATOR | : | 1 X FURUNO GP-150 |
EPIRB | : | 1 X MCMURDO E5, 406 MHZ |
SATELLITE COMPASS | : | 1 X FURUNO SC-50 |
|
|
|
FIRE FIGHTING & LIFE SAVING EQUIPMENT | ||
FIRE PUMPS | : | 1200 M3/HR BY PTO |
FIRE MONITORS (WATER/FOAM) | : | 2 UNITS WITH REMOTE CONTROL |
LIFE RAFT | : | 20 PERSONS X 2 SETS |
LIFE BUOY-RING | : | 8 SETS |
------------------------------------------------------------------------------------------------------------
2012 BUILT 32M 4000 BHP ASD TUG
BRIEF DETAILS (14092026.VED077.0915) | |||
YEAR BUILT | : |
| 2012 |
CLASS | : |
| RINA |
LENGTH | : |
| 32 M |
BREADTH (MLD) | : |
| 10 M |
DEPTH (MLD) | : |
| 5.5 M |
MAX DRAFT | : |
| 4.3 M |
GRT/NRT | : |
| 393/118 TONNES |
MAX SPEED | : |
| 10 KNOTS |
BOLLARD PULL | : |
| 50 TONNES |
ACCOMMODATION | : |
| 12 MEN |
|
|
|
|
MACHINERY | |||
MAIN ENGINE | : |
| 2 X YANMAR 6EY26W @ 4,000BHP/750 RPM |
AUXILIARY ENGINE | : |
| 2 X CATERPILLAR C6.6 |
PROPULSION | : |
| 2 X BERG. PROPULSION BAT 523 |
|
|
|
|
TANK CAPACITY | |||
FUEL & OIL | : |
| 145 TONNES (APPROX) |
FRESH WATER | : |
| 32 TONNES (APPROX) |
|
|
|
|
DECK MACHINERY | |||
HYDRAULIC COMBINED | |||
ANCHOR WINDLESS/TOWING WINCH | |||
|
|
|
|
EQUIPPED WITH FIFI 1 | |||
---------------------------------------------------------------------------------------------------------
2019 BUILT 27M 2000 BHP TUGBOAT
BRIEF DETAILS (14092026.VED077.0859) | |||
BUILT | : |
| 2019 |
FLAG | : |
| INDONESIA |
CLASS | : |
| BV |
LENGTH | : |
| 27.00 M |
BREADTH | : |
| 8.20 M |
DEPTH | : |
| 3.650 M |
DRAFT | : |
| 2.90 M |
GRT/NRT | : |
| 183/54 |
SPEED | : |
| 12 KNOTS |
BOLLARD PULL | : |
| 32 |
ACCOMMODATION | : |
| TOTAL 12 MEN |
|
|
|
|
MAIN PROPULSION | |||
MAIN ENGINES | : |
| 2 X CATERPILAR C32 ACERT 746 KW (1000 BHP) @1800RPM |
PROPELLERS | : |
| MANGANESE BRONZE |
MAIN GENERATORS | : |
| 2 X CUMMINS 48 KW |
|
|
|
|
TANK CAPACITY | |||
FUEL OIL | : |
| 105 TONS |
FRESH WATER | : |
| 32 TONS |
|
|
|
|
DECK MACHINERY EQUIPMENT | |||
ANCHOR WINDLASS | : |
| 1 X HYDRAULIC ANCHOR WINDLASS C/W DOUBLE GYPSY DRUM |
ANCHOR | : |
| 2 X 480 KG STOCKLESS BOW ANCHOR |
TOWING HOOK | : |
| 1 X 30 TONS C/W QUICK RELEASE |
KORT NOZZLES | : |
| 2.03M X 2 |
VERTICAL CAPSTAN | : |
| HYDRAULIC 3 TONS |
|
|
|
|
NAVIGATION & EQUIPMENT | |||
ECHO SOUNDER | : |
| 1 UNIT |
EPIRB HY-EP500 | : |
| 1 UNIT |
NAVTEX SAMYUNG SNX300 | : |
| 3 SETS |
INMARSAT C SAILOR 6110 | : |
| 1 SET |
WOG / SUBJECT TO AVAILABILITY
FURTHER DETAILS TO NAMED INTEREST ONLY


