Description
NON-SELF-PROPELLED LARGE-SCALE PILE DRIVING VESSEL
(SPECIALIZED FOR OFFSHORE ENGINEERING)
DELIVERY DATE: JULY 2014
CLASSIFICATION SOCIETY: CCS
NAVIGATION AREA: UNLIMITED NAVIGATION AREA (TOW-SUPPORTED, NOT SELF-PROPELLED)
PRINCIPAL DIMENSIONS
LENGTH OVERALL (LOA): 78.0 METERS
MOULDED BREADTH: 36.0 METERS
MOULDED DEPTH: 6.0 METERS (MAIN DECK TO KEEL)
STRUCTURAL DRAFT: 4.8 METERS (OPERATING LOAD)
GROSS TONNAGE (GT): APPROXIMATELY 8,500 TONS (CCS REGISTERED)
CORE CONSTRUCTION PARAMETERS PILE FRAME HEIGHT: 128 METERS
LIFTING CAPACITY: 450 TONS (MAIN HOOK OF THE PILE FRAME)
MAXIMUM PILE DIAMETER: 5.0 METERS (STEEL PIPE PILE)
MAXIMUM PILE DRIVING LENGTH: 132 METERS (ONE-TIME DRIVING WITHOUT SEGMENTATION)
INCLINED PILE CONSTRUCTION: 0° ~ 18° (TWO-WAY ADJUSTABLE)
POWER SYSTEM: 4 SETS OF MAIN GENERATORS (CAT 3516 EQUIVALENT), TOTAL INSTALLED CAPACITY: 7,200 KW
POSITIONING SYSTEM: 8-POINT MOORING POSITIONING + DUAL RTK-GPS DIFFERENTIAL POSITIONING (NO DP SYSTEM)
CONSTRUCTION ACCURACY: POSITIONING ERROR ≤ 5 CM (CENTIMETER-LEVEL PRECISION)
WIND RESISTANCE: BEAUFORT SCALE 8 (STABLE BERTHING IN SEA STATE 5)
CORE CONSTRUCTION CAPABILITIES HAMMER: LARGE-SCALE HYDRAULIC IMPACT HAMMER
SUPER-LARGE PILE CONSTRUCTION:
ONE-TIME DRIVING OF 130-METER CLASS EXTRA-LONG STEEL PIPE PILES, NO SEGMENTAL CONSTRUCTION REQUIRED
COMPLEX GEOLOGICAL ADAPTATION:
ADAPTABLE TO WEATHERED ROCK, STRONGLY WEATHERED GRANITE, AND OTHER COMPLEX STRATA
HIGH-PRECISION CONTROL:
CENTIMETER-LEVEL POSITIONING ACCURACY THROUGH DUAL GPS DIFFERENTIAL POSITIONING AND WAVE COMPENSATION
NOTABLE PROJECTS PELJESAC BRIDGE PROJECT (CROATIA, 2018–2020):
COMPLETED DRIVING OF EXTRA-LONG STEEL PIPE PILES (130-METER CLASS);
SET A WORLD RECORD FOR ONE-TIME DRIVING OF SUPER-LONG PILES.
DOMESTIC OFFSHORE WIND POWER PROJECTS (JIANGSU, SHANDONG, ETC.):
COMPLETED DRIVING OF LARGE-DIAMETER PILES FOR WIND POWER BASES;
DAILY CONSTRUCTION EFFICIENCY UP TO 9 PILES.
CROSS-SEA BRIDGE PROJECTS (CHINA):
PARTICIPATED IN PILE FOUNDATION CONSTRUCTION OF MULTIPLE CROSS-SEA BRIDGES;
SOLVED PILE DRIVING IN DEEP WATER AND COMPLEX STRATA.
WOG / SUBJECT TO AVAILABILITY
FURTHER DETAILS TO NAMED INTEREST ONLY


