Description
THE TUG IS CURRENTLY COMPLETING SS AND DD IN BATAM AND IS EXPECTED TO BE READY FOR TRADING END OF NEXT WEEK, AGW. SHE WILL PROCEED TO UAE AND THEREAFTER TO ROTTERDAM.
ALL ENGINES, SHAFTS, PUMPS, OUTBOARD VALVES AND MANY OTHER ITEMS ARE FULLY OVERHAULED DURING CURRENT REPAIRS AND THE TUG IS EXPECTED TO BE FOUND IN TIP-TOP CONDITION.
—————————————————————————————
M/TUG BAS TIGER
(EX DIAN PACIFIC)
TWIN SCREW
BUILT – 2009, CHINA
CLASS – RINA, FRESH SS/DD WILL BE COMPLETED IN MAR 2024
FLAG – PALAU
DIMS – LOA 41.8 M / BEAM 10.0 M / DEPTH 4.6 M / SUMMER DRAFT 3.6M
GT/NT – 573/172 T
BP – 52.35 TS (AS PER PREVIOUS CERTIFICATE, BUT NEW TEST WILL BE MADE NEXT WEEK)
ME – 2 × MITSUBISHI S8U-MPTK 2029 BHP EACH @ 1150 RPM
BOW THRUSTER – 315 KW
ACCOMMOD – 18 PERS
FUEL CAPACITY – 270 M3
DECK MACHINERY
HYDR TUGGER WINCH: 1 X 5 T @10 M/MIN, 150M X 22MM WIRE
HYDR TOW PIN: 2 X 200 T @200 PRESSURE BAR
POWER JAW: SWL 200 T @200 PRESSURE BAR
ANCHOR HANDLING TOW WINCH: 1 X PULL 100 T @6 M/MIN
STERN ROLLER: 150 T
DECK CRANE: 6.2T @2.3M / 0.65T @14.5M
WOG / SUBJECT TO AVAILABILITY
FURTHER DETAILS TO NAMED INTEREST ONLY