Description
BWTS: NOT INSTALLED
DUE DATE FOR INSTALLATION 25 JULY 2022 IN LINE WITH IOPP RENEWAL
– BWTS IS ON ORDER AND CAN BE NOVATED (USD 200K)
——————————————————————————–
MV MINER
FLAG LIBERIA
ABT 33002 DWT ON 9.6M DRAFT
BLT JUL/2010 TAIZHOU HAIBIN SHIPBUI, CHINA
CLASS CC SS 07/2025 DD 07/2023
LOA 178M ; BEAM 27.6M ; DEPTH 13.9M
GRT 19998 / NRT 11341 T
GRAIN: 40868 CBM
5 HO / 5 HA
GEAR 4 X 30.5 T CRANES
MAN-B&W 6S42MC7926 BHP @ 131
GENS 3
SPEED/CONSUMPTION:
AT SEA:
ABOUT 12.00 KNOTS (BALLAST) ON ABOUT 18.5 MT IFO 380CST DAILY
ABOUT 11.00 KNOTS (LADEN) ON ABOUT 18.5 MT IFO 380CST DAILY
IN PORT:
IDLE: ABOUT 1.5 MT IFO 380CST + 0.5 MT MGO DAILY
WORKING: ABOUT 2.2 MT IFO FOR ONE A/E; 4.0 MT IFO
FOR TWO A/E; 5.5 MT IFO FOR THREE A/E + 0.5 MT MGO DAILY SUBJECT TO WORKLOAD
WOG / SUBJECT TO AVAILABILITY
FURTHER DETAILS TO NAMED INTEREST ONLY