Description
DUYONG DUA AND DUYONG SATU
MPP PSV CLICK HERE FOR MORE DETAILS
BLT 2010 / 2011 IN MAL
AB
1410 DWT 1,279 GRT 389 NRT
58.30 LOA / 53.40 LBP X 13.80 BRD X 4.500 DFT
ENGINE 2 X CUMMINS ENGINE CO INC(QSK60-M) 4400 BHP TTL
GENS 2 X 250 KW, 500 KW TOTAL
PROPULSION 2 X CPP THRUSTER BOW 8T
APPROX 400 DECK AREA
FIFI 1
ACCOM 42
FUEL TANK (SHIP USE) 454 M3
FUEL TANK (CARGO) 555 M3
POTABLE WATER 111 M3
FW CARGO TANK 247 M3
SWB TANK 334 M3
LUB OIL TANK 21 M3
DIRTY OIL 9.1 M3
BILGE HOLDING TANK 9.1 M3
SEWAGE HOLDING TANK 7.5 M3
FOAM TANK 21.9 M3
DETERGENT TANK 21.9 M3
‘DUA’ – PRESENTLY LAID UP IN KEMAMAN
‘SATU’ – LAID UP MIRI, MALAYSIA SINCE JAN 2016 WITH SS DUE ON MARCH 2016.
WOG / SUBJECT TO AVAILABILITY
FURTHER DETAILS TO NAMED INTEREST ONLY