Description
MV CETUS DALL
DWT: 8500 MT ON 7.6M DRAFT
BUILT: 1/2011, CHINA
NK SS: 17/01/2026 DD: 29/10/2023
GRT: 6980 T
LOA: 112.21M BEAM: 19M DEPTH: 11.5M
2 HOLDS, 2 HATCHES
GRAIN 12741 CBM
2 X 30 T CRANES
MAIN ENGINES: 1XMAN, 7L32/40, 4759 BHP
GENERATORS: 3
———————————————————
MV CETUS MINKE
DWT: 8500 MT ON 7.6M DRAFT
BUILT: 12/2011, CHINA
NK SS: 01/12/2026 DD: 05/01/2025
GRT: 6981 T
LOA: 112.21M BEAM: 19M DEPTH: 11.5M
2 HOLDS, 2 HATCHES
GRAIN 12,741 CBM
2 X 30 T CRANES
MAIN ENGINES: 1XMAN, 7L32/40, 4283 BHP
GENERATORS: 3
WOG / SUBJECT TO AVAILABILITY
FURTHER DETAILS TO NAMED INTEREST ONLY